Intereting Facts:
A)The Tata enterprise Voltas, in association with its JV partners, supplied, installed, tested and commissioned:-
a) Electrical equipments b)air conditioning c) Plumbing and drainage d) fire fighting e) special systems like building automation, power monitoring and control, lighting and dimming control, central battery, lightening protection and earthing, fire alarm system, steam and condensate, propane gas distribution and ssolar powered hot water supply.
B)Height over 800 meters tall i.e. 2.1/2 times the height of Eiffel Tower and 11 time that of the qutub minar.
C)It has over 160 floors and 5 million sq.ft of built up area.
D) Its unique three sided structure can defeat strong desert winds while defying the scorching Dubai sun and the immence forces that can make metal expand.